Certificates and Awards
I have had perfect attendance for my junior and senior years. And have maintained a 4.0 grade point average.
Resume
Advanced Placement
This is a porch that a crew and I completed in October. Originally it was just a cement patio with a tree to shade it, but after the tree died it was unbearably hot and sunny. They decided that it time for a change and called my boss. After the price and type of materials were decided on, we were sent to start demo work on the patio. After demolishing the patio and disposing of the cement, we dug holes and placed the support posts in place. After securing the posts in place, we then cut and set the rafters for the roof. When the rough framing was completed we put oriented strand board (OSB) on the rafters, felt paper on the OSB, and shingles on the felt paper. After the roof was completed, we put the siding and soffit on. After finishing the roof and the walls, we floored the porch with green flooring and put the railing on. This might just have been another job for me, but for the homeowners this was a change that would impact the rest of their lives.
I recently did a project that consisted of removing and replacing all of the vinyl, aluminium, and gutters of a two story home. This is a picture of me finishing off the gutters.
|
One weekend while I was working, I was given the option to be interviewed about how I felt about participating in Advanced Placement. I am very grateful to the TCTC for allowing me to use such a useful program to improve my life. |